Category
|
Education |
|
Project |
John Port School, New Edale Building |
| Client |
Board of
Governors, John Port School |
| Stage |
Completed May
2006 |
| Value |
£ 2.8 Million |
A physical link ties the old and new buildings
together in the form of the blue rendered wall
running through the length of the building (a
central spine), projecting externally at either
end Internally there is a wide central corridor
running alongside the ‘blue spine of the
building’ with all the accommodation located at
either side. Open voids have been formed on the
first floor the both enable natural light to
penetrate the ground floor corridor and also allow
natural ventilation of all the rooms utilizing the
stack effect, with the high level corridor windows
being linked to automatic opening devices.
|